Geotechnical & rock analysis

…using sustainable design

Below is a list of examples that illustrate “transparent design”. These examples are intended to improve understanding, reviewability, and further development, with the goal of reducing material usage.

StructureDateLink
Steel tube bridge: 2D G2_015
Pile design: 2D2026-06-30G2_001
Pile design: 3DG3_012
Slope stability: 2D2026-06-30G2_002
Retaining wall with one level of tie-back anchorage: 2D2026-06-30G2_003
Retaining wall with two levels of tie-back anchorage: 2D2026-06-30G2_004
Retaining wall with three levels of tie-back anhorage: 2DG2_011
Excavation using steel nails: 2DG2_005
Sheet pile box: 2DG2_013
Settlement road embankment: 3DG3_014
Lime cement column (LCC): 2DG2_006
Cut and cover tunnel construction: 2DG2_007
Sequential excavation of tunnel: 2DG2_008
Rock tunnel excavation: 3DG3_009
Bankpiling with geotextile: 2DG2_010