
Geotechnical & rock analysis
…using sustainable design
Below is a list of examples that illustrate “transparent design”. These examples are intended to improve understanding, reviewability, and further development, with the goal of reducing material usage.
| Structure | Date | Link |
|---|---|---|
| Steel tube bridge: 2D | – | G2_015 |
| Pile design: 2D | 2026-06-30 | G2_001 |
| Pile design: 3D | – | G3_012 |
| Slope stability: 2D | 2026-06-30 | G2_002 |
| Retaining wall with one level of tie-back anchorage: 2D | 2026-06-30 | G2_003 |
| Retaining wall with two levels of tie-back anchorage: 2D | 2026-06-30 | G2_004 |
| Retaining wall with three levels of tie-back anhorage: 2D | – | G2_011 |
| Excavation using steel nails: 2D | – | G2_005 |
| Sheet pile box: 2D | – | G2_013 |
| Settlement road embankment: 3D | – | G3_014 |
| Lime cement column (LCC): 2D | – | G2_006 |
| Cut and cover tunnel construction: 2D | – | G2_007 |
| Sequential excavation of tunnel: 2D | – | G2_008 |
| Rock tunnel excavation: 3D | – | G3_009 |
| Bankpiling with geotextile: 2D | – | G2_010 |